ISBN: 9781407305462 - the large egyptian pyramids: modelling a complex engineering project (bar international series, band 2057) (2 Ergebnisse)

Optimieren Sie Ihre Suche

  • Bücher (2)

  • Neu (2)

bis

Benutzerdefinierte Preisspanne (EUR)

bis

  • Sprache: Englisch

    Verlag: British Archaeological Reports, 2010

    1407305468 / 9781407305462

    • Softcover

    Anbieter: Ria Christie Collections, Uxbridge, Vereinigtes KönigreichRia Christie Collections

    Verkäufer/-in mit 5 Sternen
    Verkäufer/-in kontaktieren

    Zustand: Neu

    EUR 55,76

    EUR 13,34 Versand 
    Versand von Vereinigtes Königreich nach USA

    Anzahl: Mehr als 20 verfügbar

    Zustand: New. In English.

  • Sprache: Englisch

    Verlag: Oxford : British Archaeological Reports, BAR Publishing, 2010

    1407305468 / 9781407305462

    • Softcover

    Anbieter: Joseph Burridge Books, Dagenham, Vereinigtes KönigreichJoseph Burridge Books

    Verkäufer/-in mit 5 Sternen
    Verkäufer/-in kontaktieren

    Zustand: Neu

    EUR 73,03

    EUR 27,18 Versand 
    Versand von Vereinigtes Königreich nach USA

    Anzahl: 1 verfügbar

    Soft cover. Zustand: New. xi, 125 pages : illustrations (some color), maps ; 30 cm. The building process of the Egyptian pyramids has been the subject of many publications. However, a thorough review of this literature reveals that only certain aspects of this process have been studied in isolation, without taking into account the interaction between various activities involved, such as quarrying, transportation and building and without a sound quantitative basis. The present study aims at filling this gap by means of an integrated mathematical model. Attention is focussed on the largest pyramid, the one built by Cheops. The model simulates an efficient project co-ordination by balancing supply and demand of the building material, with all the activities related to the growth of the pyramid and by assuming a constant total workforce. Itenables the reader to determine the effects of different building methods and of the productivity of the workers. Three building methods have been studied, successively making use of a linear ramp, of a spiral ramp and of levers. These methods are compared in terms of the number of men and man-years required. Calculations have been carried out for two sets of input data, indicated as base case and maximum case. In addition to the development of a comprehensive model for the construction of the pyramids,this work also contains a comparative analysis of other publications dealing with this subject. …