Anbieter: Ria Christie Collections, Uxbridge, Vereinigtes Königreich
EUR 154,10
Anzahl: Mehr als 20 verfügbar
In den WarenkorbZustand: New. In.
Anbieter: Majestic Books, Hounslow, Vereinigtes Königreich
EUR 193,74
Anzahl: 3 verfügbar
In den WarenkorbZustand: New. pp. 200.
Anbieter: Revaluation Books, Exeter, Vereinigtes Königreich
EUR 220,02
Anzahl: 2 verfügbar
In den WarenkorbHardcover. Zustand: Brand New. 1st edition. 390 pages. 9.25x6.25x1.00 inches. In Stock.
Sprache: Englisch
Verlag: ISTE Ltd and John Wiley & Sons Inc, 2021
ISBN 10: 1848217498 ISBN 13: 9781848217492
Anbieter: Kennys Bookstore, Olney, MD, USA
EUR 244,94
Anzahl: Mehr als 20 verfügbar
In den WarenkorbZustand: New. The book is aimed at showing methodologies and technological solutions for energy system monitoring and control, starting from applications to electricity smart grids and ending with more unconventional approaches to multi-carrier systems: microgrids and energy hubs. . Num Pages: 200 pages. BIC Classification: THRD. Category: (P) Professional & Vocational. Weight in Grams: 666. . 2017. 1st Edition. Hardcover. . . . . Books ship from the US and Ireland.
Anbieter: AHA-BUCH GmbH, Einbeck, Deutschland
Buch. Zustand: Neu. Neuware - This book addresses different algorithms and applications based on the theory of multiobjective goal attainment optimization. In detail the authors show as the optimal asset of the energy hubs network which (i) meets the loads, (ii) minimizes the energy costs and (iii) assures a robust and reliable operation of the multicarrier energy network can be formalized by a nonlinear constrained multiobjective optimization problem. Since these design objectives conflict with each other, the solution of such the optimal energy flow problem hasn't got a unique solution and a suitable trade off between the objectives should be identified. A further contribution of the book consists in presenting real-world applications and results of the proposed methodologies developed by the authors in three research projects recently completed and characterized by actual implementation under an overall budget of about 23 million EUR.