Verlag: Project Management Institute (edition Second Edition, Second edition), 2013
ISBN 10: 1933890134 ISBN 13: 9781933890135
Sprache: Englisch
Anbieter: BooksRun, Philadelphia, PA, USA
Paperback. Zustand: Very Good. Second Edition, Second edition. It's a well-cared-for item that has seen limited use. The item may show minor signs of wear. All the text is legible, with all pages included. It may have slight markings and/or highlighting.
Verlag: Project Management Institute, 2001
ISBN 10: 1880410818 ISBN 13: 9781880410813
Sprache: Englisch
Zustand: Good. Good condition. A copy that has been read but remains intact. May contain markings such as bookplates, stamps, limited notes and highlighting, or a few light stains.
Verlag: Project Management Institute, 2001
ISBN 10: 1880410818 ISBN 13: 9781880410813
Sprache: Englisch
Zustand: Very Good. Very Good condition. A copy that may have a few cosmetic defects. May also contain light spine creasing or a few markings such as an owner's name, short gifter's inscription or light stamp.
Verlag: Project Management Institute, 2013
ISBN 10: 1933890134 ISBN 13: 9781933890135
Sprache: Englisch
Zustand: As New. Like New condition. With CD! Second edition. Reaffirmed March 2011. A near perfect copy that may have very minor cosmetic defects.
Verlag: Project Management Institute, 2013
ISBN 10: 1933890134 ISBN 13: 9781933890135
Sprache: Englisch
Zustand: Very Good. Very Good condition. A copy that may have a few cosmetic defects. May also contain light spine creasing or a few markings such as an owner's name, short gifter's inscription or light stamp.
Verlag: Project Management Institute, 2013
ISBN 10: 1933890134 ISBN 13: 9781933890135
Sprache: Englisch
Anbieter: Better World Books, Mishawaka, IN, USA
Zustand: Very Good. Used book that is in excellent condition. May show signs of wear or have minor defects.
Verlag: Project Management Institute, 2013
ISBN 10: 1933890134 ISBN 13: 9781933890135
Sprache: Englisch
Anbieter: Better World Books, Mishawaka, IN, USA
Zustand: Good. Used book that is in clean, average condition without any missing pages.
Verlag: Project Management Institute, 2001
ISBN 10: 1880410818 ISBN 13: 9781880410813
Sprache: Englisch
Anbieter: ThriftBooks-Dallas, Dallas, TX, USA
Paperback. Zustand: Good. No Jacket. Pages can have notes/highlighting. Spine may show signs of wear. ~ ThriftBooks: Read More, Spend Less.
Verlag: Project Management Institute, 2013
ISBN 10: 1933890134 ISBN 13: 9781933890135
Sprache: Englisch
Anbieter: ThriftBooks-Dallas, Dallas, TX, USA
Paperback. Zustand: Good. No Jacket. Former library book; Pages can have notes/highlighting. Spine may show signs of wear. ~ ThriftBooks: Read More, Spend Less.
Verlag: Project Management Institute, 2013
ISBN 10: 1933890134 ISBN 13: 9781933890135
Sprache: Englisch
Anbieter: ThriftBooks-Dallas, Dallas, TX, USA
Paperback. Zustand: Fair. No Jacket. Readable copy. Pages may have considerable notes/highlighting. ~ ThriftBooks: Read More, Spend Less.
Verlag: Project Management Institute, 2013
ISBN 10: 1933890134 ISBN 13: 9781933890135
Sprache: Englisch
Anbieter: ThriftBooks-Atlanta, AUSTELL, GA, USA
Paperback. Zustand: Very Good. No Jacket. May have limited writing in cover pages. Pages are unmarked. ~ ThriftBooks: Read More, Spend Less.
Verlag: Project Management Institute, 2013
ISBN 10: 1933890134 ISBN 13: 9781933890135
Sprache: Englisch
Anbieter: ThriftBooks-Reno, Reno, NV, USA
Paperback. Zustand: Good. No Jacket. Pages can have notes/highlighting. Spine may show signs of wear. ~ ThriftBooks: Read More, Spend Less.
Verlag: Project Management Institute, 2013
ISBN 10: 1933890134 ISBN 13: 9781933890135
Sprache: Englisch
Anbieter: ThriftBooks-Dallas, Dallas, TX, USA
Paperback. Zustand: Good. No Jacket. Pages can have notes/highlighting. Spine may show signs of wear. ~ ThriftBooks: Read More, Spend Less.
Verlag: Project Management Institute, 2013
ISBN 10: 1933890134 ISBN 13: 9781933890135
Sprache: Englisch
Anbieter: ThriftBooks-Atlanta, AUSTELL, GA, USA
Paperback. Zustand: Good. No Jacket. Pages can have notes/highlighting. Spine may show signs of wear. ~ ThriftBooks: Read More, Spend Less.
Verlag: Project Management Institute, 2013
ISBN 10: 1933890134 ISBN 13: 9781933890135
Sprache: Englisch
Anbieter: Ammareal, Morangis, Frankreich
Softcover. Zustand: Très bon. Ancien livre de bibliothèque. Légères traces d'usure sur la couverture. Edition 2013. Ammareal reverse jusqu'à 15% du prix net de cet article à des organisations caritatives. ENGLISH DESCRIPTION Book Condition: Used, Very good. Former library book. Slight signs of wear on the cover. Edition 2013. Ammareal gives back up to 15% of this item's net price to charity organizations.
Verlag: Project Management Institute, 2013
ISBN 10: 1933890134 ISBN 13: 9781933890135
Sprache: Englisch
Anbieter: Ammareal, Morangis, Frankreich
Softcover. Zustand: Très bon. Ancien livre de bibliothèque. Légères traces d'usure sur la couverture. Edition 2013. Ammareal reverse jusqu'à 15% du prix net de cet article à des organisations caritatives. ENGLISH DESCRIPTION Book Condition: Used, Very good. Former library book. Slight signs of wear on the cover. Edition 2013. Ammareal gives back up to 15% of this item's net price to charity organizations.
Verlag: Project Management Institute, 2019
ISBN 10: 1628256192 ISBN 13: 9781628256192
Sprache: Englisch
Anbieter: PBShop.store UK, Fairford, GLOS, Vereinigtes Königreich
EUR 50,57
Anzahl: 15 verfügbar
In den WarenkorbPAP. Zustand: New. New Book. Shipped from UK. Established seller since 2000.
Verlag: Project Management Institute, 2019
ISBN 10: 1628256192 ISBN 13: 9781628256192
Sprache: Englisch
Anbieter: Majestic Books, Hounslow, Vereinigtes Königreich
EUR 57,20
Anzahl: 3 verfügbar
In den WarenkorbZustand: New. pp. 100.
Verlag: Project Management Institute, 2019
ISBN 10: 1628256192 ISBN 13: 9781628256192
Sprache: Englisch
Anbieter: Kennys Bookstore, Olney, MD, USA
Zustand: New. 2019. Third edition. paperback. . . . . . Books ship from the US and Ireland.
Anbieter: Revaluation Books, Exeter, Vereinigtes Königreich
EUR 86,88
Anzahl: 1 verfügbar
In den WarenkorbPaperback. Zustand: Brand New. 3rd edition. 195 pages. 10.75x8.25x0.55 inches. In Stock.
Anbieter: moluna, Greven, Deutschland
EUR 56,19
Anzahl: Mehr als 20 verfügbar
In den WarenkorbZustand: New. Serves as a guide for defining work as it relates to a specific project s objectives. The Practice Standard for Work Breakdown Structures, Third Edition supplies project managers and team members with direction for the preliminary development and the implem.
Verlag: Project Management Institute, 2013
ISBN 10: 1933890134 ISBN 13: 9781933890135
Sprache: Englisch
Anbieter: Buchpark, Trebbin, Deutschland
Zustand: Sehr gut. Zustand: Sehr gut | Sprache: Englisch | Produktart: Bücher.
Erscheinungsdatum: 2001
ISBN 13: 7681880410818
Anbieter: Better World Books Ltd, Dunfermline, Vereinigtes Königreich
EUR 36,06
Anzahl: 1 verfügbar
In den WarenkorbZustand: Good. Ships from the UK. Former library book; may include library markings. Used book that is in clean, average condition without any missing pages.