Group technology integrated planning von arn e a (3 Ergebnisse)

Autor
Titel
Mit der Detailsuche verfeinern

Optimieren Sie Ihre Suche

  • Bücher (3)

  • Neu (3)

bis

Benutzerdefinierte Preisspanne (EUR)

bis

    • Sprache: Englisch

      Verlag: Springer, 1975

      3540075054 / 9783540075059

      • Softcover

      Anbieter: Ria Christie Collections, Uxbridge, Vereinigtes KönigreichRia Christie Collections

      Verkäufer/-in mit 5 Sternen
      Verkäufer/-in kontaktieren

      Zustand: Neu

      EUR 61,01

      EUR 13,17 Versand 
      Versand von Vereinigtes Königreich nach USA

      Anzahl: Mehr als 20 verfügbar

      Zustand: New. In.

    • Sprache: Englisch

      Verlag: Springer, 1975

      3540075054 / 9783540075059

      • Softcover

      Anbieter: Revaluation Books, Exeter, Vereinigtes KönigreichRevaluation Books

      Verkäufer/-in mit 5 Sternen
      Verkäufer/-in kontaktieren

      Zustand: Neu

      EUR 77,17

      EUR 11,66 Versand 
      Versand von Vereinigtes Königreich nach USA

      Anzahl: 2 verfügbar

      Paperback. Zustand: Brand New. spi rep edition. 171 pages. 9.61x6.70x0.40 inches. In Stock.

    • Sprache: Englisch

      Verlag: Springer, Springer, 1975

      3540075054 / 9783540075059

      • Softcover

      Anbieter: AHA-BUCH GmbH, Einbeck, DeutschlandAHA-BUCH GmbH

      Verkäufer/-in mit 5 Sternen
      Verkäufer/-in kontaktieren

      Zustand: Neu

      EUR 53,49

      EUR 61,58 Versand 
      Versand von Deutschland nach USA

      Anzahl: 1 verfügbar

      Taschenbuch. Zustand: Neu. Druck auf Anfrage Neuware - Printed after ordering - Group Technology (GT) as a manufacturing concept has gained steady interest within the machine building industry all over the world. Originally it was used more or less only in the so-called parts family manufacturing concept. With growing opportunities for using the computer in the design process, operating planning and layout planning, the potential advantages became more and more obvious. In order to implement GT successfully and with a view to improving the overall economic situation of a production company, it is necessary to consider all aspects of the com plete manufacturing system. Experience has shown, that in the first stage a general basis has to be formed. This is done by a clear and practical definition of three GT manufacturing systems, the devel opment of a set of classification systems for work pieces, working operations and man ufacturing equipment, and in building a data bank from which a data basis for the GT planning process can be evaluated. A second stage of implementation then considers the particular aspects of GT. These are, firstly, a concept for layout and investment planning based on a representative parts spectrum; secondly, for application of the GT-idea in the design process three similar types of parts are to be developed as a logical supplement to the standard and recurring parts practice; thirdly, a three stage process planning and work measurement system can be developed for the so defined spectrum of similar parts.