Sprache: Englisch
Verlag: Berrett-Koehler Publishers, Incorporated, 2001
ISBN 10: 1567261353 ISBN 13: 9781567261356
Anbieter: Better World Books, Mishawaka, IN, USA
Zustand: Good. Pages intact with minimal writing/highlighting. The binding may be loose and creased. Dust jackets/supplements are not included. Stock photo provided. Product includes identifying sticker. Better World Books: Buy Books. Do Good.
Sprache: Englisch
Verlag: Berrett-Koehler Publishers, Incorporated, 2001
ISBN 10: 1567261353 ISBN 13: 9781567261356
Anbieter: Better World Books, Mishawaka, IN, USA
Zustand: Very Good. Former library copy. Pages intact with possible writing/highlighting. Binding strong with minor wear. Dust jackets/supplements may not be included. Includes library markings. Stock photo provided. Product includes identifying sticker. Better World Books: Buy Books. Do Good.
Sprache: Englisch
Verlag: Berrett-Koehler Publishers, 2001
ISBN 10: 1567261353 ISBN 13: 9781567261356
Zustand: Very Good. Very Good condition. A copy that may have a few cosmetic defects. May also contain light spine creasing or a few markings such as an owner's name, short gifter's inscription or light stamp.
Sprache: Englisch
Verlag: Berrett-Koehler Publishers, 2001
ISBN 10: 1567261353 ISBN 13: 9781567261356
Zustand: Good. Good condition. A copy that has been read but remains intact. May contain markings such as bookplates, stamps, limited notes and highlighting, or a few light stains.
Sprache: Englisch
Verlag: Berrett-Koehler Publishers, 2001
ISBN 10: 1567261353 ISBN 13: 9781567261356
Anbieter: ThriftBooks-Phoenix, Phoenix, AZ, USA
Paperback. Zustand: Very Good. No Jacket. May have limited writing in cover pages. Pages are unmarked. ~ ThriftBooks: Read More, Spend Less.
Sprache: Englisch
Verlag: Berrett-Koehler Publishers, 2001
ISBN 10: 1567261353 ISBN 13: 9781567261356
Anbieter: ThriftBooks-Reno, Reno, NV, USA
Paperback. Zustand: Very Good. No Jacket. May have limited writing in cover pages. Pages are unmarked. ~ ThriftBooks: Read More, Spend Less.
Sprache: Englisch
Verlag: Berrett-Koehler Publishers, 2001
ISBN 10: 1567261353 ISBN 13: 9781567261356
Anbieter: ThriftBooks-Dallas, Dallas, TX, USA
Paperback. Zustand: Good. No Jacket. Pages can have notes/highlighting. Spine may show signs of wear. ~ ThriftBooks: Read More, Spend Less.
Sprache: Englisch
Verlag: Berrett-Koehler Publishers, 2001
ISBN 10: 1567261353 ISBN 13: 9781567261356
Anbieter: ThriftBooks-Atlanta, AUSTELL, GA, USA
Paperback. Zustand: Very Good. No Jacket. May have limited writing in cover pages. Pages are unmarked. ~ ThriftBooks: Read More, Spend Less.
Sprache: Englisch
Verlag: Berrett-Koehler Publishers, 2001
ISBN 10: 1567261353 ISBN 13: 9781567261356
Anbieter: ThriftBooks-Dallas, Dallas, TX, USA
Paperback. Zustand: Very Good. No Jacket. May have limited writing in cover pages. Pages are unmarked. ~ ThriftBooks: Read More, Spend Less.
Sprache: Englisch
Verlag: Berrett-Koehler Publishers, 2001
ISBN 10: 1567261353 ISBN 13: 9781567261356
Anbieter: WorldofBooks, Goring-By-Sea, WS, Vereinigtes Königreich
EUR 13,63
Anzahl: 1 verfügbar
In den WarenkorbPaperback. Zustand: Very Good. The book has been read, but is in excellent condition. Pages are intact and not marred by notes or highlighting. The spine remains undamaged.
Zustand: New. Offering perspectives on how to apply the work breakdown structure (WBS) to different types of projects to produce products, services or results, this book shows how to use WBS throughout the project lifecycle to plan, control and communicate. It helps improve the planning of new projects and launch projects more efficiently and effectively. Series: Project Management Essential Library. Num Pages: 100 pages, Illustrations. BIC Classification: KJM. Category: (G) General (US: Trade); (P) Professional & Vocational. Dimension: 179 x 254 x 7. Weight in Grams: 232. . 2002. 1st Edition. Paperback. . . . . Books ship from the US and Ireland.
Sprache: Englisch
Verlag: Berrett-Koehler Publishers, 2001
ISBN 10: 1567261353 ISBN 13: 9781567261356
Anbieter: moluna, Greven, Deutschland
EUR 31,88
Anzahl: Mehr als 20 verfügbar
In den WarenkorbKartoniert / Broschiert. Zustand: New. Gregory T. Haugan, Ph.D., PMP, is a PM system application and implementation expert with over 40 years of experience as a consultant and in government and private-sector positions. Vice President with GLH, Incorporated, he specializes in management consulti.
Zustand: Sehr gut. Zustand: Sehr gut | Sprache: Englisch | Produktart: Bücher | Keine Beschreibung verfügbar.