Isbn: 9798191407753 - the plant: from auxiliary operator to the control room — navigating a replacement-hiring market in power generation (a field guide) (3 Ergebnisse)

- Softcover
Anbieter: PBShop.store US, Wood Dale, IL, USAPBShop.store US
Verkäufer/-in kontaktierenVerkäufer/-in mit 5 SternenZustand: Neu
EUR 21,40
Versand gratisVersand innerhalb von USAAnzahl: Mehr als 20 verfügbar
PAP. Zustand: New. New Book. Shipped from UK. Established seller since 2000.

- Softcover
Anbieter: PBShop.store UK, Fairford, GLOS, Vereinigtes KönigreichPBShop.store UK
Verkäufer/-in kontaktierenVerkäufer/-in mit 5 SternenZustand: Neu
EUR 19,61
EUR 3,89 VersandVersand von Vereinigtes Königreich nach USAAnzahl: Mehr als 20 verfügbar
PAP. Zustand: New. New Book. Shipped from UK. Established seller since 2000.

- Softcover
Anbieter: AHA-BUCH GmbH, Einbeck, DeutschlandAHA-BUCH GmbH
Verkäufer/-in kontaktierenVerkäufer/-in mit 5 SternenZustand: Neu
EUR 27,98
EUR 35,00 VersandVersand von Deutschland nach USAAnzahl: 2 verfügbar
Taschenbuch. Zustand: Neu. Neuware - The projections say decline.The control rooms say otherwise.Here is a paradox worth a career: government projections show power plant operator headcount declining - and yet plants are hiring, urgently. Median pay is $102,040 (2025), about 31,600 people hold the job, roughly 2,500 openings appear each year, and 60% of entrants start with a high-school diploma (O\*NET/BLS 51-8013 family, hand-verified).The resolution of the paradox is replacement. NERC's 2025 Long-Term Reliability Assessment documents record load growth - a 224 GW summer peak and tens of gigawatts of gas in interconnection queues - while the industry's own workforce body has documented an aging-operator cliff for years. Fewer total seats; a constant stream of empty ones.This book is the career path the exam-prep shelf skips: how the auxiliary-operator to control-room-operator qualification ladder actually works, how to choose a plant type (peaker, combined-cycle, hydro) and what each does to your life, how Navy machinist and electrician watchstanding converts, and how the federal civil-service route - TVA, USACE, Reclamation - differs from investor-owned utilities.It is honest about the industry's direction: this is a replacement-hiring and life-extension market, not a growth story, and the book says so with the LTRA's own numbers. That honesty is exactly why the opportunity is real - almost nobody under forty is applying.Licensing is jurisdiction-specific and signposted: stationary-engineer and boiler licences are city- and state-level where they exist, some roles require NERC certification, and federal hiring runs on its own civil-service rules. An Australian appendix covers state plant-operations licensing separately - nothing ports.Everyone is chasing new industries. The old one pays six figures and cannot find you.…