ISBN: 9798173517258 - protective relay testing and commissioning: practical methods for protection verification, troubleshooting, and substation energization (1 Ergebnisse)

ISBN: 
Mit der Detailsuche verfeinern

Optimieren Sie Ihre Suche

  • Bücher (1)

  • Neu (1)

bis

Benutzerdefinierte Preisspanne (EUR)

bis

  • Sprache: Englisch

    Verlag: Independently Published Sep 2026, 2026

    9798173517258

    • Softcover

    Anbieter: AHA-BUCH GmbH, Einbeck, DeutschlandAHA-BUCH GmbH

    Verkäufer/-in mit 5 Sternen
    Verkäufer/-in kontaktieren

    Zustand: Neu

    EUR 139,21

    EUR 35,00 Versand 
    Versand von Deutschland nach USA

    Anzahl: 2 verfügbar

    Taschenbuch. Zustand: Neu. Neuware - A protective relay does nothing visible for almost all of its service life. It measures, compares, and waits - and then, in the brief and violent moment a fault arrives, everything depends on whether the protection was proven correctly before it went into service. The gap between a relay that is configured correctly and a protection scheme that actually works is wide, and it is where commissioning failures hide. A setting that is right on paper means little if a current transformer is wired with reversed polarity, if a trip contact lands on the wrong breaker, if a communications channel behaves unexpectedly, or if a single logic equation is wrong. Rote, menu-driven procedures collapse the moment the equipment, scheme, or symptom differs from the example.>What you will be able to do: - Verify the full measurement-to-trip chain, from instrument transformers through relay logic to breaker operation.- Test overcurrent (50/51), differential (87), and distance (21) protection, including inverse-time curves, restraint characteristics, harmonic/inrush security, and boundary searches.- Prove synchronism-check, dead-bus/dead-line logic, and communications-assisted scheme behaviour end to end.- Carry out safe secondary and primary injection with correct isolation, test blocks, and trip-path control.- Plan and time distributed, multi-terminal end-to-end tests, then move a scheme through pre-energization readiness, staged energization, and clean handover.- Investigate misoperations with event timelines, oscillography, and a competing-hypotheses method, and build a maintenance programme that keeps protection dependable.>Written for relay test technicians, protection and control engineers, and substation commissioning engineers - and suitable for advanced students entering the field - this is the first-principles reference for anyone who must prove a scheme before it is trusted. Take the next step toward testing and commissioning protection with clarity and confidence: open the book and start building tests that are rigorous, repeatable, and understood.…