Isbn: 9789083643199 - engineering for reliability: fmea, rcm, maintainability and lcc for projects (the reliability framework: english-language edition, band 8) (3 Ergebnisse)

ISBN: 
Mit der Detailsuche verfeinern

Optimieren Sie Ihre Suche

  • Bücher (3)

  • Neu (3)

bis

Benutzerdefinierte Preisspanne (EUR)

bis

  • Sprache: Englisch

    Verlag: Independently published, 2026

    9083643190 / 9789083643199

    Serie: Buch 8 von 9 - The Reliability Framework: English-Language Edition

    • Softcover

    Anbieter: PBShop.store US, Wood Dale, IL, USAPBShop.store US

    Verkäufer/-in mit 5 Sternen
    Verkäufer/-in kontaktieren

    Zustand: Neu

    EUR 38,71

     Versand gratis 
    Versand innerhalb von USA

    Anzahl: Mehr als 20 verfügbar

    PAP. Zustand: New. New Book. Shipped from UK. Established seller since 2000.

  • Sprache: Englisch

    Verlag: Independently published, 2026

    9083643190 / 9789083643199

    Serie: Buch 8 von 9 - The Reliability Framework: English-Language Edition

    • Softcover

    Anbieter: PBShop.store UK, Fairford, GLOS, Vereinigtes KönigreichPBShop.store UK

    Verkäufer/-in mit 5 Sternen
    Verkäufer/-in kontaktieren

    Zustand: Neu

    EUR 36,67

    EUR 3,88 Versand 
    Versand von Vereinigtes Königreich nach USA

    Anzahl: Mehr als 20 verfügbar

    PAP. Zustand: New. New Book. Shipped from UK. Established seller since 2000.

  • Sprache: Englisch

    Verlag: Independently Published Mai 2026, 2026

    9083643190 / 9789083643199

    Serie: Buch 8 von 9 - The Reliability Framework: English-Language Edition

    • Softcover

    Anbieter: AHA-BUCH GmbH, Einbeck, DeutschlandAHA-BUCH GmbH

    Verkäufer/-in mit 5 Sternen
    Verkäufer/-in kontaktieren

    Zustand: Neu

    EUR 48,58

    EUR 35,00 Versand 
    Versand von Deutschland nach USA

    Anzahl: 2 verfügbar

    Taschenbuch. Zustand: Neu. Neuware - 80% of your maintenance costs are determined during design Four hours of downtime equals $4,200 in damage. The real cost $18,000 over three years - because during design a cheaper motor was chosen that saved $3,000. Every $1,000 saved in design causes on average $47,000 in extra maintenance costs over the asset's lifetime. The problem: 80% of reliability problems originate during design and construction. This book shows you how to build reliability in from the very first design decision. Every phase treated systematically with concrete methodologies and calculation models. Complete methodology in 6 phases- Phase 1: Understanding the problem - the 80/20 rule of reliability engineering, the 5-Why technique for root causes, the iceberg principle: real costs are 3-5 times higher than visible repair costs- Phase 2: Specifications - stakeholder analysis, Early Equipment Management, and RAMS methodology (Reliability, Availability, Maintainability, Safety) to define quantitative objectives- Phase 3: Criticality analysis - set priorities across five risk dimensions: safety, environment, delivery reliability, quality, and sustainability. Determine which assets deserve $50,000-$500,000 in engineering versus a $500 basic analysis. Result: $1.3 million in savings, 18% higher availability- Phase 4: Design - FMEA: seven core questions identify all failure modes, RPN prioritizes improvements. Maintainability: five design principles (accessibility, visibility, standardization, modularity, diagnostics). RCM prevents both over- and under-maintenance- Phase 5: Economic justification - Life Cycle Costing: pump B ($12,000) saves $85,000 versus pump A ($8,000) through lower energy and maintenance costs. NPV calculations and business cases that convince management- Phase 6: Realization - commissioning, systematic supplier selection, and portfolio management creating $1.4 million in additional valueProven results- 35% lower lifecycle costs through thorough analysis- Up to 47:1 return on reliability investment- $1.3 million savings through criticality analysis- $50,000-$100,000 gain per asset through LCC- 60-80% fewer commissioning problemsTools included>Who is this book for >Part of a larger whole>About the author>Stop paying to fix in operations what went wrong during design.…