Performance-Based Earned Value
Solomon, Paul; Young, Ralph
Verkauft von ThriftBooks-Atlanta, AUSTELL, GA, USA
AbeBooks-Verkäufer seit 24. März 2009
Gebraucht - Softcover
Zustand: Gebraucht - Ausreichend
Anzahl: 1 verfügbar
In den Warenkorb legenVerkauft von ThriftBooks-Atlanta, AUSTELL, GA, USA
AbeBooks-Verkäufer seit 24. März 2009
Zustand: Gebraucht - Ausreichend
Anzahl: 1 verfügbar
In den Warenkorb legenReadable copy. Pages may have considerable notes/highlighting. ~ ThriftBooks: Read More, Spend Less.
Bestandsnummer des Verkäufers G0471721883I5N00
Performance-Based Earned Value uniquely shows project managers how to effectively integrate technical, schedule, and cost objectives by improving earned value management (EVM) practices. Providing innovative guidelines, methods, examples, and templates consistent with capability models and standards, this book approaches EVM from a practical level with understandable techniques that are applicable to the management of any project.
Clear and unambiguous instructions explain how to incorporate EVM with key systems engineering, software engineering, and project management processes such as establishing the technical or quality baseline, requirements management, using product metrics, and meeting success criteria for technical reviews. Detailed information is included on linking product requirements, project work products, the project plan, and the Performance Measurement Baseline (PMB), as well as correlating technical performance measures (TPM) with EVM. With straightforward instructions on how to use EVM on a simple project, such as building a house, and on complex projects, such as high-risk IT and engineering development projects, it is the only book that includes excerpts from the PMI®'s Project Management Body of Knowledge (PMBOK®), CMMI, the EVM System standard, systems engineering standards, federal acquisition regulations, and Department of Defense guides.
Performance-Based Earned Value allows both novices and experienced project managers, including project manager of suppliers and customers in the commercial and government sectors; software and systems engineering process improvement leaders; CMMI appraisers; PMI members; and IEEE Computer Society members to:
Written by Paul Solomon and Ralph Young, internationally recognized industry experts, Performance-Based Earned Value is constructed from guidance in standards and capability models for EVM, systems engineering, software engineering, and project management. It is the complete guide to EVM, invaluable in helping students prepare for the PMI®-PMP® exam with practical examples and templates to facilitate understanding, and in guiding project professionals in the private and public sectors to use EVM on complex projects.
(PMI, PMBOK, PMP, and Project Management Professional are registered marks of the Project Management Institute, Inc.)
PAUL J. SOLOMON, PMP, is an internationally known consultant and author on Earned Value Management (EVM), and founder of his firm, Performance-Based Earned Value®. Mr. Solomon led the use of EVM on programs at Northrop Grumman Corporation, including the B-2 Stealth Bomber and the F-35 Joint Strike Fighter. He is a coauthor of EVM standards, including the national standard, ANSI/EIA-748 (for which he received the U.S. Department of Defense David Packard Excellence in Acquisition Award) and the PMI Practice Standard for EVM. He was a visiting scientist at the Software Engineering Institute (SEI) and wrote an SEI report on CMMI® and EVM. Mr. Solomon frequently speaks at industry and government conferences and is a tutor concerning EVM, systems engineering, and software engineering in the U.S. and India.
RALPH R. YOUNG, DBA, is Director of Engineering Process Improvement, Systems and Process Engineering, Defense Group at Northrop Grumman Information Technology. Dr. Young helped lead his former business unit (Litton PRC) to CMM Level 5 and his current business unit to CMMI® Level 5. Northrop Grumman Corporation's Defense Group was the first organization in the world to be evaluated a second time at CMMI® Level 5. Dr. Young supports continuous improvement for both internal and external projects, to make process improvements, implement effective requirements practices, and develop innovations to facilitate project management.
„Über diesen Titel“ kann sich auf eine andere Ausgabe dieses Titels beziehen.
We guarantee the condition of every book as it's described
on the Abebooks website. If you're dissatisfied with your
purchase (Incorrect Book/Not as Described/Damaged) or if the
order hasn't arrived, you're eligible for a refund within 30
days of the estimated delivery date. If you've changed your
mind about a book that you've ordered, please use the "Ask
bookseller a question link to contact us" and we'll respond
as soon as possible.
All domestic Standard and Expedited shipments are distributed from our warehouses by OSM, then handed off to the USPS for final delivery.
2-Day Shipping is delivered by FedEx, which does not deliver to PO boxes.
International shipments are tendered to the local postal service in the destination country for final delivery – we do not use courier services for international deliveries.
| Bestellmenge | 4 bis 8 Werktage | 4 bis 8 Werktage | 
|---|---|---|
| Erster Artikel | EUR 0.00 | EUR 0.00 | 
Die Versandzeiten werden von den Verkäuferinnen und Verkäufern festgelegt. Sie variieren je nach Versanddienstleister und Standort. Sendungen, die den Zoll passieren, können Verzögerungen unterliegen. Eventuell anfallende Abgaben oder Gebühren sind von der Käuferin bzw. dem Käufer zu tragen. Die Verkäuferin bzw. der Verkäufer kann Sie bezüglich zusätzlicher Versandkosten kontaktieren, um einen möglichen Anstieg der Versandkosten für Ihre Artikel auszugleichen.





