Performance-Based Earned Value

Paul Solomon; Ralph Young

ISBN 10: 0471721883 ISBN 13: 9780471721888
Verlag: Wiley-IEEE Computer Society Pr (edition 1), 2006
Gebraucht Paperback

Verkäufer BooksRun, Philadelphia, PA, USA Verkäuferbewertung 5 von 5 Sternen 5 Sterne, Erfahren Sie mehr über Verkäufer-Bewertungen

AbeBooks-Verkäufer seit 2. Februar 2016


Beschreibung

Beschreibung:

Ship within 24hrs. Satisfaction 100% guaranteed. APO/FPO addresses supported. Bestandsnummer des Verkäufers 0471721883-8-1

Diesen Artikel melden

Inhaltsangabe:

A complete toolkit for implementation of Earned Value Management

Performance-Based Earned Value uniquely shows project managers how to effectively integrate technical, schedule, and cost objectives by improving earned value management (EVM) practices. Providing innovative guidelines, methods, examples, and templates consistent with capability models and standards, this book approaches EVM from a practical level with understandable techniques that are applicable to the management of any project.

Clear and unambiguous instructions explain how to incorporate EVM with key systems engineering, software engineering, and project management processes such as establishing the technical or quality baseline, requirements management, using product metrics, and meeting success criteria for technical reviews. Detailed information is included on linking product requirements, project work products, the project plan, and the Performance Measurement Baseline (PMB), as well as correlating technical performance measures (TPM) with EVM. With straightforward instructions on how to use EVM on a simple project, such as building a house, and on complex projects, such as high-risk IT and engineering development projects, it is the only book that includes excerpts from the PMI®'s Project Management Body of Knowledge (PMBOK®), CMMI, the EVM System standard, systems engineering standards, federal acquisition regulations, and Department of Defense guides.

Performance-Based Earned Value allows both novices and experienced project managers, including project manager of suppliers and customers in the commercial and government sectors; software and systems engineering process improvement leaders; CMMI appraisers; PMI members; and IEEE Computer Society members to:

  • Incorporate product requirements and planned quality into the PMB
  • Conduct an Integrated Baseline Review
  • Analyze performance reports
  • Perform independent assessments and predictive analysis
  • Ensure that key TPMs are selected, monitored, and reported
  • Identify the right success criteria for technical reviews
  • Develop techniques for monitoring and controlling supplier performance
  • Integrate risk management with EVM
  • Comply with government acquisition policies and regulations

Written by Paul Solomon and Ralph Young, internationally recognized industry experts, Performance-Based Earned Value is constructed from guidance in standards and capability models for EVM, systems engineering, software engineering, and project management. It is the complete guide to EVM, invaluable in helping students prepare for the PMI®-PMP® exam with practical examples and templates to facilitate understanding, and in guiding project professionals in the private and public sectors to use EVM on complex projects.

(PMI, PMBOK, PMP, and Project Management Professional are registered marks of the Project Management Institute, Inc.)

Über die Autorin bzw. den Autor:

PAUL J. SOLOMON, PMP, is an internationally known consultant and author on Earned Value Management (EVM), and founder of his firm, Performance-Based Earned Value®. Mr. Solomon led the use of EVM on programs at Northrop Grumman Corporation, including the B-2 Stealth Bomber and the F-35 Joint Strike Fighter. He is a coauthor of EVM standards, including the national standard, ANSI/EIA-748 (for which he received the U.S. Department of Defense David Packard Excellence in Acquisition Award) and the PMI Practice Standard for EVM. He was a visiting scientist at the Software Engineering Institute (SEI) and wrote an SEI report on CMMI® and EVM. Mr. Solomon frequently speaks at industry and government conferences and is a tutor concerning EVM, systems engineering, and software engineering in the U.S. and India.

RALPH R. YOUNG, DBA, is Director of Engineering Process Improvement, Systems and Process Engineering, Defense Group at Northrop Grumman Information Technology. Dr. Young helped lead his former business unit (Litton PRC) to CMM Level 5 and his current business unit to CMMI® Level 5. Northrop Grumman Corporation's Defense Group was the first organization in the world to be evaluated a second time at CMMI® Level 5. Dr. Young supports continuous improvement for both internal and external projects, to make process improvements, implement effective requirements practices, and develop innovations to facilitate project management.

„Über diesen Titel“ kann sich auf eine andere Ausgabe dieses Titels beziehen.

Bibliografische Details

Titel: Performance-Based Earned Value
Verlag: Wiley-IEEE Computer Society Pr (edition 1)
Erscheinungsdatum: 2006
Einband: Paperback
Zustand: Very Good
Auflage: 1.

Beste Suchergebnisse beim ZVAB

Beispielbild für diese ISBN

Solomon, Paul, Young, Ralph
ISBN 10: 0471721883 ISBN 13: 9780471721888
Gebraucht Softcover

Anbieter: Better World Books, Mishawaka, IN, USA

Verkäuferbewertung 5 von 5 Sternen 5 Sterne, Erfahren Sie mehr über Verkäufer-Bewertungen

Zustand: Very Good. Used book that is in excellent condition. May show signs of wear or have minor defects. Artikel-Nr. 16451994-6

Verkäufer kontaktieren

Gebraucht kaufen

EUR 12,21
Versand gratis
Versand innerhalb von USA

Anzahl: 1 verfügbar

In den Warenkorb

Beispielbild für diese ISBN

Solomon, Paul; Young, Ralph
ISBN 10: 0471721883 ISBN 13: 9780471721888
Gebraucht Paperback

Anbieter: ThriftBooks-Atlanta, AUSTELL, GA, USA

Verkäuferbewertung 5 von 5 Sternen 5 Sterne, Erfahren Sie mehr über Verkäufer-Bewertungen

Paperback. Zustand: Fair. No Jacket. Readable copy. Pages may have considerable notes/highlighting. ~ ThriftBooks: Read More, Spend Less. Artikel-Nr. G0471721883I5N00

Verkäufer kontaktieren

Gebraucht kaufen

EUR 12,89
Versand gratis
Versand innerhalb von USA

Anzahl: 1 verfügbar

In den Warenkorb

Foto des Verkäufers

Paul Solomon (Autor), Ralph Young (Autor):
ISBN 10: 0471721883 ISBN 13: 9780471721888
Gebraucht Paperback

Anbieter: Vulkaneifel Bücher, Birgel, Deutschland

Verkäuferbewertung 5 von 5 Sternen 5 Sterne, Erfahren Sie mehr über Verkäufer-Bewertungen

Paperback. Zustand: Sehr gut. Leichte Druckstelle auf der Covervorderseite, kleine Lagerspuren am Buch, Inhalt einwandfrei und ungelesen 233065 Sprache: Englisch Gewicht in Gramm: 570. Artikel-Nr. 384924

Verkäufer kontaktieren

Gebraucht kaufen

EUR 36,99
EUR 60,00 shipping
Versand von Deutschland nach USA

Anzahl: 1 verfügbar

In den Warenkorb

Beispielbild für diese ISBN

Solomon, Paul J./ Young, Ralph R.
Verlag: IEEE Computer Society, 2006
ISBN 10: 0471721883 ISBN 13: 9780471721888
Neu Paperback

Anbieter: Revaluation Books, Exeter, Vereinigtes Königreich

Verkäuferbewertung 5 von 5 Sternen 5 Sterne, Erfahren Sie mehr über Verkäufer-Bewertungen

Paperback. Zustand: Brand New. illustrated edition. 320 pages. 9.25x9.00x1.00 inches. In Stock. Artikel-Nr. __0471721883

Verkäufer kontaktieren

Neu kaufen

EUR 120,07
EUR 14,33 shipping
Versand von Vereinigtes Königreich nach USA

Anzahl: 1 verfügbar

In den Warenkorb

Beispielbild für diese ISBN

Paul Solomon
Verlag: John Wiley and Sons Ltd, 2006
ISBN 10: 0471721883 ISBN 13: 9780471721888
Neu Softcover

Anbieter: Kennys Bookstore, Olney, MD, USA

Verkäuferbewertung 4 von 5 Sternen 4 Sterne, Erfahren Sie mehr über Verkäufer-Bewertungen

Zustand: New. A complete toolkit for implementation of Earned Value Management Performance-Based Earned Value uniquely shows project managers how to effectively integrate technical, schedule, and cost objectives by improving earned value management (EVM) practices. Series: Practitioners. Num Pages: 320 pages, Illustrations. BIC Classification: KJ. Category: (P) Professional & Vocational. Dimension: 235 x 162 x 18. Weight in Grams: 480. . 2006. 1st Edition. Paperback. . . . . Books ship from the US and Ireland. Artikel-Nr. V9780471721888

Verkäufer kontaktieren

Neu kaufen

EUR 134,44
EUR 8,92 shipping
Versand innerhalb von USA

Anzahl: 15 verfügbar

In den Warenkorb