Guidelines for Open Pit Slope Design in Weak Rocks
Verkauft von PBShop.store US, Wood Dale, IL, USA
AbeBooks-Verkäufer seit 7. April 2005
Neu - Hardcover
Zustand: Neu
Versand innerhalb von USA
Anzahl: 1 verfügbar
In den Warenkorb legenVerkauft von PBShop.store US, Wood Dale, IL, USA
AbeBooks-Verkäufer seit 7. April 2005
Zustand: Neu
Anzahl: 1 verfügbar
In den Warenkorb legenNew Book. Shipped from UK. Established seller since 2000.
Bestandsnummer des Verkäufers FT-9781138298095
Weak rocks encountered in open pit mines cover a wide variety of materials, with properties ranging between soil and rock. As such, they can provide a significant challenge for the slope designer. For these materials, the mass strength can be the primary control in the design of the pit slopes, although structures can also play an important role. Because of the typically weak nature of the materials, groundwater and surface water can also have a controlling influence on stability.
Guidelines for Open Pit Slope Design in Weak Rocks
is a companion to Guidelines for Open Pit Slope Design,which was published in 2009 and dealt primarily with strong rocks. Both books were commissioned under the Large Open Pit (LOP) project, which is sponsored by major mining companies. These books provide summaries of the current state of practice for the design, implementation and assessment of slopes in open pits, with a view to meeting the requirements of safety, as well as the recovery of anticipated ore reserves.
This book, which follows the general cycle of the slope design process for open pits, contains 12 chapters. These chapters were compiled and written by industry experts and contain a large number of case histories. The initial chapters address field data collection, the critical aspects of determining the strength of weak rocks, the role of groundwater in weak rock slope stability and slope design considerations, which can differ somewhat from those applied to strong rock. The subsequent chapters address the principal weak rock types that are encountered in open pit mines, including cemented colluvial sediments, weak sedimentary mudstone rocks, soft coals and chalk, weak limestone, saprolite, soft iron ores and other leached rocks, and hydrothermally altered rocks. A final chapter deals with design implementation aspects, including mine planning, design implementation, monitoring, surface water control and closure of weak rock slopes.
Key Features:
As with the other books in this series, Guidelines for Open Pit Slope Design in Weak Rocks provides guidance to practitioners involved in the design and implementation of open pit slopes, particularly geotechnical engineers, mining engineers, geologists and other personnel working at operating mines.
Derek Martin obtained his BSc in 1972 from Memorial University, his MEng from the University of Alberta in 1983 and his PhD from the University of Manitoba in 1993. He has over 35 years of experience in rock engineering associated with rock slopes, tunnels, caverns and dams. His early years were spent on construction sites for major civil, hydroelectric and underground projects. In 1987 he joined AECL, where he directed the geomechanics research at the Underground Research Laboratory in southeastern Manitoba and was senior adviser to the Director of the Canadian Nuclear Fuel Waste Management Program. From 1995-99, he served as Associate Director of the Geomechanics Research Centre at Laurentian University, working on the deep mining projects in the Sudbury basin. Since 2000, Dr Martin has been Professor in Geotechnical Engineering at the University of Alberta, where he holds an NSERC Industrial Research Chair. Dr Martin is a Fellow of the Engineering Institute of Canada and a Fellow of The Canadian Academy of Engineering.
Peter Stacey has 40 years' experience in all aspects of pit slope and mining geotechnical design, project management and review. He holds a BSc Hons. degree in Geology and a D.I.C. from Imperial College, London, and is a registered engineer in Canada and the UK. After working for the Geological Survey of Sweden and subsequently with the Iron Ore Company of Canada as Supervisor – Geotechnical Engineering, Mr Stacey joined Golder Associates Ltd, based in Vancouver, Canada. During his 29 years with Golder, Mr Stacey worked primarily in the areas of pit slope design and the application of geotechnical engineering to the operational aspects of open pit mines. In 2003, he formed Stacey Mining Geotechnical Ltd to concentrate on independent review consulting related to the geotechnical aspects of open pit mining. In this capacity, he currently serves as either review consultant or on the Geotechnical Review Board for several large open pit operations. He also performs geotechnical review for a number of mining and consulting companies.
„Über diesen Titel“ kann sich auf eine andere Ausgabe dieses Titels beziehen.
Returns Policy
We ask all customers to contact us for authorisation should they wish to return their order. Orders returned without authorisation may not be credited.
If you wish to return, please contact us within 14 days of receiving your order to obtain authorisation.
Returns requested beyond this time will not be authorised.
Our team will provide full instructions on how to return your order and once received our returns department will process your refund.
Please note the cost to return any...
Wenn Sie Verbraucher sind, können Sie gemäß den folgenden Bestimmungen vom Vertrag zurücktreten. Verbraucher ist jede natürliche Person, die zu Zwecken handelt, die nicht ihrer kaufmännischen, gewerblichen, künstlerischen oder beruflichen Tätigkeit zugerechnet werden können.
Informationen zum Widerrufsrecht
Gesetzliches Widerrufsrecht
Sie haben das Recht, den Vertrag innerhalb von 14 Tagen ohne Angabe von Gründen zu widerrufen.
Die Widerrufsfrist beträgt 14 Tage ab dem Tag, an dem Sie oder ein von Ihnen benannter Dritter, der nicht der Transporteur ist, die letzte Ware oder den letzten Posten oder das letzte Exemplar in Besitz genommen hat.
Um das Widerrufsrecht auszuüben, füllen Sie auf unserer Website unter „Meine Einkäufe" in „Mein Nutzerkonto" eine eindeutige Erklärung elektronisch aus und senden Sie sie ab. Wir werden Ihnen unverzüglich eine Bestätigung über den Eingang eines solchen Widerrufs auf einem dauerhaften Datenträger (z. B. per E-Mail) übermitteln.
Um die Widerrufsfrist einzuhalten, reicht es aus, dass Sie Ihre Mitteilung über die Ausübung des Widerrufsrechts vor Ablauf der Widerrufsfrist absenden.
Auswirkungen des Widerrufs
Wenn Sie diesen Vertrag widerrufen, erstatten wir Ihnen alle Zahlungen, die wir von Ihnen erhalten haben, einschließlich der Lieferkosten (mit Ausnahme der zusätzlichen Kosten, die entstehen, wenn Sie eine andere Art der Lieferung als die von uns angebotene günstigste Standardlieferung gewählt haben).
Wir können einen Abzug von der Rückerstattung für den Wertverlust der gelieferten Waren vornehmen, wenn der Verlust auf eine unnötige Behandlung durch Sie zurückzuführen ist.
Wir werden die Rückerstattung unverzüglich und nicht später als 14 Tage nach dem Tag vornehmen, an dem wir über Ihre Entscheidung, diesen Vertrag zu widerrufen, informiert wurden.
Für die Rückerstattung verwenden wir dasselbe Zahlungsmittel, das Sie für die ursprüngliche Transaktion verwendet haben, es sei denn, Sie haben ausdrücklich etwas anderes vereinbart; in keinem Fall werden Ihnen aufgrund einer solchen Rückerstattung Gebühren berechnet.
Wir können die Rückzahlung verweigern, bis wir die Waren wieder zurückerhalten haben oder Sie den Nachweis erbracht haben, dass Sie die Waren zurückgesandt haben, je nachdem, was eher eintritt.
Sie müssen die Waren unverzüglich und in jedem Fall spätestens 14 Tage ab dem Tag, an dem Sie uns über den Widerruf dieses Vertrags unterrichten, an PBShop.store US, Springfield Gardens, New York, U.S.A., +44 1285 712917, zurücksenden oder übergeben. Die Frist ist eingehalten, wenn Sie die Ware vor Ablauf der Frist von 14 Tagen zurücksenden. Sie müssen die direkten Kosten der Rücksendung der Waren tragen. Sie haften nur für einen etwaigen Wertverlust der Waren, der auf eine Behandlung zurückzuführen ist, die nicht zur Prüfung der Art, Eigenschaften und Funktionsweise der Waren erforderlich ist.
Ausnahmen vom Widerrufsrecht
Das Widerrufsrecht gilt nicht für:
Books are shipped from our US or UK warehouses. Delivery estimates allow for delivery from either location.
| Bestellmenge | 7 bis 14 Werktage | 7 bis 14 Werktage |
|---|---|---|
| Erster Artikel | EUR 0.00 | EUR 0.00 |
Die Versandzeiten werden von den Verkäuferinnen und Verkäufern festgelegt. Sie variieren je nach Versanddienstleister und Standort. Sendungen, die den Zoll passieren, können Verzögerungen unterliegen. Eventuell anfallende Abgaben oder Gebühren sind von der Käuferin bzw. dem Käufer zu tragen. Die Verkäuferin bzw. der Verkäufer kann Sie bezüglich zusätzlicher Versandkosten kontaktieren, um einen möglichen Anstieg der Versandkosten für Ihre Artikel auszugleichen.