Earned Value Project Management (Fourth Edition)

Sprache: Englisch

Verlag: Project Management Institute, 2010

1935589083 / 9781935589082

  • Hardcover
  • Gebraucht
Alle Details anzeigen

Anbieter: Wonder Book, Frederick, MD, USAWonder Book

Verkäufer/-in mit 5 Sternen

Verkäufer:in bei ZVAB seit 1. November 1997

Verbandsmitglied: ABAAILAB

Hardcover

Zustand: Gebraucht - Gut

EUR 47,78

 Versand gratis 
Versand innerhalb von USA

Anzahl: 1 verfügbar

In den Warenkorb
30 Tage kostenlose Rückgabe

Artikelbeschreibung des Verkäufers

Very Good condition. 4th edition. A copy that may have a few cosmetic defects. May also contain light spine creasing or a few markings such as an owner's name, short gifter's inscription or light stamp.

Titel
Earned Value Project Management (Fourth Edition)
Autor
Fleming PhD MSc, Quentin W., Koppelman, Joel M.
Verlag
Project Management Institute
Erscheinungsjahr
2010
Zustand
Very Good
Einband
Hardcover
Sprache
Englisch
ISBN-10
1935589083
ISBN-13
9781935589082
Auflage
4. Auflage

Wonder Book

Frederick, MD, USA

Verkäufer/-in mit 5 Sternen

Verkäufer:in bei ZVAB seit 1. November 1997

Verbandsmitglied:

Versandkosten innerhalb von USA

Artikel5 bis 9 Werktage3 bis 6 Werktage
Erster ArtikelEUR 0,00EUR 10,02
Die Versandzeiten werden von den Verkäuferinnen und Verkäufern festgelegt. Sie variieren je nach Versanddienstleister und Standort. Sendungen, die den Zoll passieren, können Verzögerungen unterliegen. Eventuell anfallende Abgaben oder Gebühren sind von der Käuferin bzw. dem Käufer zu tragen. Die Verkäuferin bzw. der Verkäufer kann Sie bezüglich zusätzlicher Versandkosten kontaktieren, um einen möglichen Anstieg der Versandkosten für Ihre Artikel auszugleichen.

Zahlungsarten

  • Visa
  • Mastercard
  • American Express
  • Carte Bleue
  • Apple Pay
  • Google Pay

Shopbeschreibung

With 3 stores less than 1 hour outside the DC/Metropolitan area (1 in Gaithersburg, 1 in Frederick and 1 in Hagerstown, MD), we have the largest selection of books in the tri-state area. Wonder Book and Video has been in business since 1980 and online since 1997. We have over 1 Million books for sale on our website and another 1 Million books for sale in our 3 locations. Items on Abe are not necessarily in stock at our retail locations. Please do not call the stores to place orders for Abe Books sales. We have a very active online inventory and as such, we can receive multiple orders for the same item. We fill those orders on a first come first serve basis, but will refund promptly any items that are out of stock. Since 1980 it has always been about the books. ALL kinds of books from 95 cent children's paperbacks to five figure rare and collectibles. A merging of the old and new is where we started, and it is where we are today. Our retail stores have always been places where a reader can rush in looking for a title needed for a term paper that is due the next day, or where bibliophiles can get lost "in the stacks" for as long as they wish. In 2002 USAToday recognized us as "1 of 10 Great Old Bookstores", and we have been featured in numerous other newspaper and TV stories including Washington Post and CSpan. Members ABAA, ILAB.…

Verbandsmitglied

  • Antiquarian Booksellers' Association of America
  • International League of Antiquarian Booksellers
Die Mitglieder dieser Verbände haben sich verpflichtet, die höchsten Standards einzuhalten. Sie verbürgen sich für die Echtheit aller zum Verkauf angebotenen Artikel. Sie liefern fachkundige und detaillierte Beschreibungen, legen alle wesentlichen Mängel und/oder Restaurierungen offen, bieten klare und genaue Preisangaben und arbeiten während des Kaufprozesses fair und ehrlich.

Unternehmensdaten der Verkäuferin bzw. des Verkäufers

Wonder Book

Wonder Book and Video, 1550 Tilco Drive
Frederick, MD USA 21704