Modular delivery promises a faster route to a working facility, and on the right project it delivers exactly that. What it does not do is remove coordination risk. It relocates it — into the seam between the factory floor and the site, a handoff that conventional construction protocols were never designed to watch.
That seam is where the expensive failures live. A gasket substituted on the factory floor for sound reasons that nobody thought to report. A design change that reached the site team but never reached the fabricator. A truck journey nobody instrumented. A module that passed every test it was given, and still could not hold dew point once installed.
None of these require an incompetent party or a defective module. Every fabricator delivered a product that passed its own quality checks. The cost accumulated in the handoffs around them.
Written by a chartered quantity surveyor with thirty years across four countries, this is a practitioner's field manual for the cost and coordination gaps that modular delivery introduces into cleanrooms, dry rooms, battery plants, semiconductor fabs, and data centre power and cooling skids.
Three composite case studies — a battery dry room, semiconductor cleanroom pods, and data centre power and cooling skids — trace nine coordination failures from cause to invoice, with the cost and schedule consequences reconciled in full.
Includes a complete field guide appendix: audit checklists, contract clause language, a receiving readiness checklist, the four-state gating framework, and a failure-mode quick reference you can take onto a live project.
For quantity surveyors, cost managers, project controls professionals, commissioning agents, owner's representatives, and anyone accountable for a facility that arrives on a truck.
Part of the Cost Management Professional Series.
Die Inhaltsangabe kann sich auf eine andere Ausgabe dieses Titels beziehen.
Anbieter: AHA-BUCH GmbH, Einbeck, Deutschland
Taschenbuch. Zustand: Neu. Neuware. Artikel-Nr. 9798192747957
Anzahl: 2 verfügbar