Modular construction is an emerging construction technique due to its valuable benefits. This, on the other hand, faces a degree of uncertainty due to internal and external elements such as engineering, occupational, cultural, socioeconomic, and financial concerns that impact the project outcome mainly time and cost. Existing risk management research for conventional construction cannot be accurately applied to modular construction since modular construction is by nature different from conventional. This study is intended to identify primary risk factors associated with modular construction and conduct an assessment of their impacts on project cost and duration and compare them with those of conventional risks. After gathering a comprehensive list of risks in both construction methodologies, their probabilities and impacts on project cost and time were gathered through questionnaires and interviews. Based on the weighted average probabilities and impacts, risk categorization as per these three criteria was made. Moreover, comparison risk matrices were developed for different categories of risks.
Die Inhaltsangabe kann sich auf eine andere Ausgabe dieses Titels beziehen.
Muhammad Zeeshan MunirEingetragener Bauingenieur.Bachelor of Applied Science Architekturtechnik und Design.Universität für Technik und Technologie, UET, Lahore.
„Über diesen Titel“ kann sich auf eine andere Ausgabe dieses Titels beziehen.
Anbieter: preigu, Osnabrück, Deutschland
Taschenbuch. Zustand: Neu. Risk Of Conventional And Modular Construction On Project Time And Cost | Muhammad Zeeshan Munir (u. a.) | Taschenbuch | Englisch | 2023 | LAP LAMBERT Academic Publishing | EAN 9786206142133 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu. Artikel-Nr. 126647661
Anzahl: 5 verfügbar