This book discusses the influence of design errors on the duration of projects. The findings indicate that the selected predictor variable (project design errors,) account for 52.3% of the variation in the project time run. This book therefore comes in handy to mitigate against the huge risk of project time overrun and the related cost at the design stage. It is recommended for all project managers, contractors and client organizations.
Die Inhaltsangabe kann sich auf eine andere Ausgabe dieses Titels beziehen.
The author is an Project Engineer experienced in various project knowledge areas and currently working with nzoia Sugar company,- Kenya, as a Project design manager and doing part time teaching at Jomo Kenyatta University, Kenya.
„Über diesen Titel“ kann sich auf eine andere Ausgabe dieses Titels beziehen.
Anbieter: preigu, Osnabrück, Deutschland
Taschenbuch. Zustand: Neu. Influence of Project Design Errors on Project Time Run | Kennedy Cherwenyi | Taschenbuch | 56 S. | Englisch | 2019 | LAP LAMBERT Academic Publishing | EAN 9786139997367 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu. Artikel-Nr. 115971949
Anzahl: 5 verfügbar
Anbieter: Buchpark, Trebbin, Deutschland
Zustand: Sehr gut. Zustand: Sehr gut | Seiten: 56 | Sprache: Englisch | Produktart: Bücher | This book discusses the influence of design errors on the duration of projects. The findings indicate that the selected predictor variable (project design errors,) account for 52.3% of the variation in the project time run. This book therefore comes in handy to mitigate against the huge risk of project time overrun and the related cost at the design stage. It is recommended for all project managers, contractors and client organizations. Artikel-Nr. 34225176/2
Anzahl: 1 verfügbar
Anbieter: Buchpark, Trebbin, Deutschland
Zustand: Hervorragend. Zustand: Hervorragend | Seiten: 56 | Sprache: Englisch | Produktart: Bücher | This book discusses the influence of design errors on the duration of projects. The findings indicate that the selected predictor variable (project design errors,) account for 52.3% of the variation in the project time run. This book therefore comes in handy to mitigate against the huge risk of project time overrun and the related cost at the design stage. It is recommended for all project managers, contractors and client organizations. Artikel-Nr. 34225176/1
Anzahl: 1 verfügbar