This project was formulated on the basis to focus on the time required for performing jobs on frame assembly shop of Atlas Honda Pakistan limited (Karachi Plant) by developing a rating factor for each assembly station at the assembly plant and also Reducing of assembly line balance delay by re-balancing of the assembly line. Hence, finally Improving overall productivity through assessment of various human factors at the workplace.
Die Inhaltsangabe kann sich auf eine andere Ausgabe dieses Titels beziehen.
Ali Akbar is currently serving as Lecturer in Industrial Engineering and Management department at the Dawood University of Engineering & Technology Karachi, Pakistan.Presently, he is pursuing his MSc in Mechanical Engineering from Universiti Teknologi PETRONAS (UTP) Malaysia.
„Über diesen Titel“ kann sich auf eine andere Ausgabe dieses Titels beziehen.
Anbieter: Revaluation Books, Exeter, Vereinigtes Königreich
Paperback. Zustand: Brand New. 188 pages. 8.66x5.91x0.43 inches. In Stock. Artikel-Nr. zk6134973645
Anzahl: 1 verfügbar
Anbieter: preigu, Osnabrück, Deutschland
Taschenbuch. Zustand: Neu. Productivity Improvement through Time Study Analysis | Practical Implementation | Ali Akbar Jaffery (u. a.) | Taschenbuch | 188 S. | Englisch | 2018 | LAP LAMBERT Academic Publishing | EAN 9786134973649 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu. Artikel-Nr. 111228646
Anzahl: 5 verfügbar