Competitive Bidding, Competitive Sealed Proposal, Construction Management Agency, Construction Management at Risk, Design-Build, Design-Build-Bridging, and Job Order Contracting are seven project delivery methods (PDM) that are commonly used in the state of Texas today. This book empirically compares the cost, schedule, and change order management performance of these project delivery methods (PDM) through in-depth analysis of selected construction projects that are chosen from the State of Texas by Engineering News Record (ENR) as the Best Construction Projects of the year 2009. Detailed information on research methodology, survey instrument, performance metrics, results, interpretations, and conclusions of the analysis are presented. Also presented are the "Lessons Learned", provided by the project participants.
Die Inhaltsangabe kann sich auf eine andere Ausgabe dieses Titels beziehen.
Navaneethan Rajan is a Project Controls Professional, currently working for PAE, Inc. He holds a Master's degree in Construction Management and a Bachelor's degree in Architecture. His research interest includes Project Delivery Methods, Advanced Scheduling, and Project Management. More information about the author can be found at www.rajann.com.
„Über diesen Titel“ kann sich auf eine andere Ausgabe dieses Titels beziehen.
Anbieter: preigu, Osnabrück, Deutschland
Taschenbuch. Zustand: Neu. Impact of Project Delivery Methods on Texas Construction Projects | A Detailed Analysis of 2009 ENR Best Projects in Texas | Navaneethan Rajan | Taschenbuch | 96 S. | Englisch | 2015 | LAP LAMBERT Academic Publishing | EAN 9783848447978 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu. Artikel-Nr. 106502634
Anzahl: 5 verfügbar