Quick Changeover Revolution in Critical Processing Lines: The Standard Model for SMED - Softcover

Thamatapu, Balamurali

 
9783846586433: Quick Changeover Revolution in Critical Processing Lines: The Standard Model for SMED

Inhaltsangabe

To achieve “manufacturing excellence”, Companies must exploit all available Decision – support – systems to supplement production planning for greater productivity. Since levels of productivity and profitability should be the major indices for sustainability in today’s dynamic and competitive environment, techniques like SMED offer a great potential to reduce product CT and so aid competitiveness. To make such improvements, industrial engineering tools like time study, Pareto charts, cause and effect analysis, cost - benefit techniques, etc. can be used to identify required changes, eliminations and externalizations of set – up activities and then more refined set-ups can be developed to save production time. The following points were concluded from the project: 1.Flexible man power technique plays major role in operator involvement during Changeover period which builds machine ownership culture. 2.Cross functional team working helps in proper data collection, analysis and to find low cost optimum solution. 3.In case of Rush orders, Set up time should be minimum since it is considered one among 7 big losses.

Die Inhaltsangabe kann sich auf eine andere Ausgabe dieses Titels beziehen.

Reseña del editor

To achieve “manufacturing excellence”, Companies must exploit all available Decision – support – systems to supplement production planning for greater productivity. Since levels of productivity and profitability should be the major indices for sustainability in today’s dynamic and competitive environment, techniques like SMED offer a great potential to reduce product CT and so aid competitiveness. To make such improvements, industrial engineering tools like time study, Pareto charts, cause and effect analysis, cost - benefit techniques, etc. can be used to identify required changes, eliminations and externalizations of set – up activities and then more refined set-ups can be developed to save production time. The following points were concluded from the project: 1.Flexible man power technique plays major role in operator involvement during Changeover period which builds machine ownership culture. 2.Cross functional team working helps in proper data collection, analysis and to find low cost optimum solution. 3.In case of Rush orders, Set up time should be minimum since it is considered one among 7 big losses.

Biografía del autor

Mr. Balamurali Thamatapu has obtained his M.Sc(Engg) in Engineering and Manufacturing Management in 2011. Since then he worked in different projects in the field of Lean Manufacturing. One of his project elected as a best kaizen from Confederation of Indian Industry (CII).

„Über diesen Titel“ kann sich auf eine andere Ausgabe dieses Titels beziehen.