Purchasing .Fabrication Assembly Distribution Figure 1.1: Multi-Level Manufacturing System for Make-to-Order Products specific resources of a type, i.e., a certain machine or a single worker, the determination of the sequence operations are processed on a ma chine, and the assignment of start and finish times to operations. We will modify this framework to be specifically suited for multi level make-to-order manufacturing systems. We assume that the facil ity design issue is settled, i.e., the location and the layout of the facility as well as the capacity ofthe three main resource types of the company are determined. These resource types are the engineering department, the fabrication department, and the assembly department. The engineering department is concerned with the construction of new products as well as the modification and customization of ex isting products. This entails the generation of engineering documents such as blue prints for manufacturing. The capacity of the engineering department is determined by the the count and qualification of engi neers and by the availability of construction devices such as computer aided design (CAD) systems etc.
Die Inhaltsangabe kann sich auf eine andere Ausgabe dieses Titels beziehen.
Anbieter: Ria Christie Collections, Uxbridge, Vereinigtes Königreich
Zustand: New. In. Artikel-Nr. ria9783642074318_new
Anzahl: Mehr als 20 verfügbar
Anbieter: preigu, Osnabrück, Deutschland
Taschenbuch. Zustand: Neu. Make-to-Order Assembly Management | Rainer Kolisch | Taschenbuch | xi | Englisch | 2010 | Springer Vieweg | EAN 9783642074318 | Verantwortliche Person für die EU: Springer Verlag GmbH, Tiergartenstr. 17, 69121 Heidelberg, juergen[dot]hartmann[at]springer[dot]com | Anbieter: preigu. Artikel-Nr. 107174534
Anzahl: 5 verfügbar
Anbieter: AHA-BUCH GmbH, Einbeck, Deutschland
Taschenbuch. Zustand: Neu. Druck auf Anfrage Neuware - Printed after ordering - Purchasing .Fabrication Assembly Distribution Figure 1.1: Multi-Level Manufacturing System for Make-to-Order Products specific resources of a type, i.e., a certain machine or a single worker, the determination of the sequence operations are processed on a ma chine, and the assignment of start and finish times to operations. We will modify this framework to be specifically suited for multi level make-to-order manufacturing systems. We assume that the facil ity design issue is settled, i.e., the location and the layout of the facility as well as the capacity ofthe three main resource types of the company are determined. These resource types are the engineering department, the fabrication department, and the assembly department. The engineering department is concerned with the construction of new products as well as the modification and customization of ex isting products. This entails the generation of engineering documents such as blue prints for manufacturing. The capacity of the engineering department is determined by the the count and qualification of engi neers and by the availability of construction devices such as computer aided design (CAD) systems etc. Artikel-Nr. 9783642074318
Anzahl: 1 verfügbar