The acquisition process for a new weapon system begins with development of technical requirements to ensure that the system produced provides the needed operational capability within budget and schedule constraints. Oversights during this process can result in cost or schedule overruns, unsuitable operational performance, or outright cancellation. This report describes a systems-based approach to help improve this process.
Die Inhaltsangabe kann sich auf eine andere Ausgabe dieses Titels beziehen.
Anbieter: WorldofBooks, Goring-By-Sea, WS, Vereinigtes Königreich
Paperback. Zustand: Very Good. The book has been read, but is in excellent condition. Pages are intact and not marred by notes or highlighting. The spine remains undamaged. Artikel-Nr. GOR013308821
Anzahl: 1 verfügbar
Anbieter: MusicMagpie, Stockport, Vereinigtes Königreich
Zustand: Very Good. 1753699325. 7/28/2025 10:42:05 AM. Artikel-Nr. U9781977409782
Anzahl: 1 verfügbar