Due to a lack of appreciation of the true economic identity of projects, techniques and metrics that could hugely improve project selection and performance are not being used. This book provides insights and innovative techniques drawn from more than a quarter century of experience. These techniques have the potential to transform program and project management from the current haphazard application of various techniques and metrics to an incisive and integrated approach where programs and projects are managed for the crucial economic and financial implications that are at the essence of every project investment.
Die Inhaltsangabe kann sich auf eine andere Ausgabe dieses Titels beziehen.
Stephen A. Devaux, PMP, MSPM, is president of Analytic Project Management (APM), a training and consulting company he founded in 1992. APM is a Global R.E.P. of the Project Management Institute (PMI). Their clients include BAE Systems, Siemens, Wells Fargo, Texas Instruments, Wyeth Pharmaceuticals, iRobot, L-3 Communications, American Power Conversion, Irving Oil, and Respironics.
Devaux is the author of the book, Total Project Control: A Manager’s Guide to Integrated Project Planning, Measuring, and Tracking (1999, Wiley). He has worked to develop and use new approaches and metrics in project management with clients in a wide range of industries. “When the DIPP Dips” was published in the Project Management Journal in 1992 (an article that was reprinted in PMI’s Essentials of Project Control in 1999). He has contributed chapters on his new scheduling metric, critical path drag, in two 2013 books: Project Management in the Oil and Gas Industries and Handbook of Emergency Response. He has authored numerous articles and PMI webinars, and is a frequent speaker at PMI chapter meetings throughout the United States.
He began his career at Fidelity Investments, Citicorp, and the Federal Reserve Bank of Boston and then taught and consulted in project management at Project Software and Development, Inc. (PSDI). He has taught graduate project management courses at Suffolk University, Brandeis University, and The University of the West Indies/Barbados and in executive education programs at Bentley University and University of Massachusetts/Lowell. Born in Barbados, he has been living in the United States since 1964. He is a Vietnam veteran and a naturalized US citizen. He lives with his wife, Deborah, in Swampscott, Massachusetts.
„Über diesen Titel“ kann sich auf eine andere Ausgabe dieses Titels beziehen.
Gratis für den Versand innerhalb von/der USA
Versandziele, Kosten & DauerEUR 13,72 für den Versand von Vereinigtes Königreich nach USA
Versandziele, Kosten & DauerAnbieter: ThriftBooks-Dallas, Dallas, TX, USA
Hardcover. Zustand: Very Good. No Jacket. May have limited writing in cover pages. Pages are unmarked. ~ ThriftBooks: Read More, Spend Less 1.1. Artikel-Nr. G1482212706I4N00
Anzahl: 1 verfügbar
Anbieter: Ria Christie Collections, Uxbridge, Vereinigtes Königreich
Zustand: New. In. Artikel-Nr. ria9781482212709_new
Anzahl: Mehr als 20 verfügbar
Anbieter: Revaluation Books, Exeter, Vereinigtes Königreich
Hardcover. Zustand: Brand New. 231 pages. 8.00x5.00x1.00 inches. In Stock. Artikel-Nr. x-1482212706
Anzahl: 2 verfügbar