Operations Research began with the mathematical scheduling of a massive project—logistically supplying Europe with military equipment and goods during the WWII. Today project scheduling research continues growing in a variety of its theoretical models, in its magnitude and application. As the world becomes more interrelated and complex, the wider its research is applied to an increasing number of project scheduling problems.
Project Scheduling: Surveying the State-of-the-Art surveys the current state-of-the-art in operations research with chapters written by the respective leading experts on each topic. It covers the range of the key models in the field, including deterministic, probabilistic, single- and multi-mode, single- and multi-objective, and a general model on discrete-continuous resources. Recent solution algorithms are systematical examined. The book summarize sthe current developments and theoretical achievements in the field, including project uncertainty and grid resource management.
Die Inhaltsangabe kann sich auf eine andere Ausgabe dieses Titels beziehen.
Anbieter: Ria Christie Collections, Uxbridge, Vereinigtes Königreich
Zustand: New. In English. Artikel-Nr. ria9781441941442_new
Anzahl: Mehr als 20 verfügbar
Anbieter: preigu, Osnabrück, Deutschland
Taschenbuch. Zustand: Neu. Perspectives in Modern Project Scheduling | Joanna Jozefowska (u. a.) | Taschenbuch | International Series in Operations Research & Management Science | xxii | Englisch | 2010 | Springer | EAN 9781441941442 | Verantwortliche Person für die EU: Springer Verlag GmbH, Tiergartenstr. 17, 69121 Heidelberg, juergen[dot]hartmann[at]springer[dot]com | Anbieter: preigu. Artikel-Nr. 107207855
Anzahl: 5 verfügbar
Anbieter: AHA-BUCH GmbH, Einbeck, Deutschland
Taschenbuch. Zustand: Neu. Druck auf Anfrage Neuware - Printed after ordering - Operations Research began with the mathematical scheduling of a massive project-logistically supplying Europe with military equipment and goods during the WWII. Today project scheduling research continues growing in a variety of its theoretical models, in its magnitude and application. As the world becomes more interrelated and complex, the wider its research is applied to an increasing number of project scheduling problems. Project Scheduling: Surveying the State-of-the-Art surveys the current state-of-the-art in operations research with chapters written by the respective leading experts on each topic. It covers the range of the key models in the field, including deterministic, probabilistic, single- and multi-mode, single- and multi-objective, and a general model on discrete-continuous resources. Recent solution algorithms are systematical examined. The book summarize sthe current developments and theoretical achievements in the field, including project uncertainty and grid resource management. Artikel-Nr. 9781441941442
Anzahl: 1 verfügbar
Anbieter: Revaluation Books, Exeter, Vereinigtes Königreich
Paperback. Zustand: Brand New. 444 pages. 9.25x6.10x1.07 inches. In Stock. Artikel-Nr. x-1441941444
Anzahl: 2 verfügbar