Excerpt from Engineering and Contracting, Vol. 51: January June, 1919
I. Annual cost of roadbed. Relation between wheel load and 1. Cost of paving, bridges and culverts. 2. Maintenance of paving, bridges and culverts. 3. Administration. 4. Amortization. II. Annual cost of power. Relation between wheel load and Interest on power plant. License and taxes. Insurance. Administration. Garaging. Gasoline. Oil grease and waste. Drivers' salaries. Maintenance. 10. Amortization. III. Annual cost of power.
About the Publisher
Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com
This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.
Die Inhaltsangabe kann sich auf eine andere Ausgabe dieses Titels beziehen.
Anbieter: PBShop.store US, Wood Dale, IL, USA
PAP. Zustand: New. New Book. Shipped from UK. Established seller since 2000. Artikel-Nr. LW-9781333197193
Anbieter: PBShop.store UK, Fairford, GLOS, Vereinigtes Königreich
PAP. Zustand: New. New Book. Shipped from UK. Established seller since 2000. Artikel-Nr. LW-9781333197193
Anzahl: 15 verfügbar