An updated and revised edition of the standard work on the use of critical path methods (CPM) in the construction industry. Describes the mechanics and procedures of CPM in construction planning and works control and demonstrates its application to large and small projects alike. Emphasis is not on the mathematics--the stress here is on the solution of problems commonly encountered in construction practice.
Die Inhaltsangabe kann sich auf eine andere Ausgabe dieses Titels beziehen.
James M. Antill and Ronald W. Woodhead are the authors of Critical Path Methods in Construction Practice, 4th Edition, published by Wiley.
„Über diesen Titel“ kann sich auf eine andere Ausgabe dieses Titels beziehen.
Anbieter: Better World Books Ltd, Dunfermline, Vereinigtes Königreich
Zustand: Good. 4th. Former library copy. Pages intact with minimal writing/highlighting. The binding may be loose and creased. Dust jackets/supplements are not included. Includes library markings. Stock photo provided. Product includes identifying sticker. Better World Books: Buy Books. Do Good. Artikel-Nr. GRP18628924
Anzahl: 1 verfügbar
Anbieter: PBShop.store UK, Fairford, GLOS, Vereinigtes Königreich
HRD. Zustand: New. New Book. Shipped from UK. Established seller since 2000. Artikel-Nr. FW-9780471620570
Anzahl: 15 verfügbar
Anbieter: GreatBookPricesUK, Woodford Green, Vereinigtes Königreich
Zustand: As New. Unread book in perfect condition. Artikel-Nr. 33746
Anzahl: Mehr als 20 verfügbar
Anbieter: Majestic Books, Hounslow, Vereinigtes Königreich
Zustand: New. pp. 448. Artikel-Nr. 6449264
Anzahl: 3 verfügbar
Anbieter: Ria Christie Collections, Uxbridge, Vereinigtes Königreich
Zustand: New. In English. Artikel-Nr. ria9780471620570_new
Anzahl: Mehr als 20 verfügbar
Anbieter: moluna, Greven, Deutschland
Gebunden. Zustand: New. An updated and revised edition of the standard work on the use of critical path methods (CPM) in the construction industry. Describes the mechanics and procedures of CPM in construction planning and works control and demonstrates its application to large an. Artikel-Nr. 446917505
Anzahl: Mehr als 20 verfügbar
Anbieter: Revaluation Books, Exeter, Vereinigtes Königreich
Hardcover. Zustand: Brand New. 4th sub edition. 448 pages. 9.50x6.50x1.00 inches. In Stock. Artikel-Nr. x-0471620572
Anzahl: 2 verfügbar
Anbieter: AHA-BUCH GmbH, Einbeck, Deutschland
Buch. Zustand: Neu. Neuware - An updated and revised edition of the standard work on the use of critical path methods (CPM) in the construction industry. Describes the mechanics and procedures of CPM in construction planning and works control and demonstrates its application to large and small projects alike. Emphasis is not on the mathematics--the stress here is on the solution of problems commonly encountered in construction practice. Artikel-Nr. 9780471620570
Anzahl: 2 verfügbar
Anbieter: Kennys Bookstore, Olney, MD, USA
Zustand: New. An updated and revised edition of the standard work on the use of critical path methods (CPM) in the construction industry. Describes the mechanics and procedures of CPM in construction planning and works control and demonstrates its application to large and small projects alike. Num Pages: 448 pages, index. BIC Classification: TBJ; TNK. Category: (P) Professional & Vocational; (XV) Technical / Manuals. Dimension: 236 x 165 x 30. Weight in Grams: 792. . 1990. 4th. Hardcover. . . . . Books ship from the US and Ireland. Artikel-Nr. V9780471620570
Anzahl: Mehr als 20 verfügbar